I — Datum

CONTINUOUS IMPROVEMENT PLAYBOOKS

Step-by-step guides for running CI methodologies. Each playbook covers preparation, execution, follow-up, and the tools you need at each stage. Written for facilitators and practitioners.

Ref: Protzman · Rother · Shingo · Imai · ISO 9001:2015

II — Operations Manual Index

# Playbook Domain Description
PB-001 ISO 9001 Internal Audit Playbook QMS · Audit Audit program planning, clause-by-clause checklists, opening and closing meetings, nonconformity grading, corrective action tracking, and management review reporting. Covers surveillance and recertification cycles. In preparation
PB-002 5S Implementation Playbook Lean · Workplace Sort, Set in Order, Shine, Standardize, Sustain. Area selection, red tag events, shadow boards, audit scorecards, and the sustainment cadence that prevents backsliding. Includes floor layout templates. In preparation
PB-003 Kaizen Event Facilitation Guide Lean · Events Three-week preparation, five-day execution, 30-day follow-up. Team selection, scope charter, data collection plan, daily report-outs, newspaper action items, and sustainment verification. In preparation
PB-004 Value Stream Mapping: Current to Future State Lean · VSM Product family selection, current state walk, process box data collection, lead time ladder, information flow mapping. Future state design with supermarket pulls, FIFO lanes, pacemaker process, and pitch intervals. In preparation
PB-005 Keeping a Vandrebok Hoshin · Harada Hoshin kanri’s cascade and review discipline applied to one person’s own book, in the spirit of the Harada method: chartering an improvement from a kaizen burst, tying it to one measurable rather than an estimated saving, running the action items, reading the before and after off the map, and what to carry with you when you change employers. In preparation
PB-006 MDI (Managing for Daily Improvement) Playbook Lean · MDI Tier 1 through Tier 4 board design. Hour-by-hour tracking, escalation protocols, gemba walk routes, leader standard work integration, and the daily accountability cycle that connects the floor to strategy. In preparation
PB-007 Leader Standard Work Lean · LSW Structured daily routines for supervisors, managers, and directors. Gemba checklists, process confirmation schedules, coaching kata integration, and the discipline of making abnormality visible at every level. In preparation

This is the index of the playbook series. The guides below are being written and are not published yet — each row says so. When they land they will be free to read, with no signup or email required.