I — Datum
FREE ENGINEERING TOOLS
Quality and manufacturing calculators. No signup required.
SPC, capability analysis, DOE, lean, measurement systems, risk, and QMS.
Ref: AIAG · Montgomery · ISO 22514-2
II — Instrument Index
| # | Instrument | Domain | Specification |
|---|---|---|---|
| Statistical Process Control | |||
| 1 | Cpk / Ppk Calculator | SPC · Capability | Process capability indices from measurements. Cp, Cpk, Pp, Ppk, sigma level, DPMO. |
| 2 | Bayesian Cpk Calculator | Bayesian · SPC | P(Cpk > 1.33) and credible intervals. Posterior distribution of capability. |
| 3 | Control Chart Generator | SPC · Charts | Shewhart I-MR and X-bar/R. Nelson rules, Cp/Cpk, PNG export. |
| 4 | Sigma Level / DPMO Converter | Six Sigma · Quality | Convert DPMO, sigma level, yield, and Cpk equivalent. |
| Measurement Systems | |||
| 5 | Gage R&R Calculator | MSA · Measurement | Crossed Gage R&R with ANOVA. %GRR, NDC, variance components. |
| Design of Experiments | |||
| 6 | Sample Size Calculator | DOE · Hypothesis Testing | Required n for t-tests, proportions, ANOVA. Power curves. |
| Lean & Production | |||
| 7 | OEE Calculator | TPM · Manufacturing | Availability, Performance, Quality breakdown. |
| 8 | Takt Time Calculator | Lean · Production | Takt time, line balance visualization, bottleneck identification. |
| 9 | Little’s Law Calculator | Lean · Flow | Any two of WIP, throughput and lead time give the third. Process cycle efficiency and queue share. |
| 10 | EOQ Calculator | Lean · Lot Sizing | Economic order quantity, order interval, cost curve, and what a setup reduction is worth. |
| 11 | Kanban Card Generator | Lean · Inventory | Print-ready cards with barcodes/QR. CR80, half-letter, 4×6. |
| Quality & Risk | |||
| 12 | Pareto Chart Generator | Quality · Root Cause | 80/20 analysis with cumulative line. PNG export. |
| 13 | FMEA RPN Calculator | FMEA · Risk | Severity × Occurrence × Detection. AIAG-VDA Action Priority. |
| 14 | First Pass Yield & RTY | Yield · Six Sigma | Per-step FPY, rolled throughput yield, hidden factory waste. |
| 15 | Cost of Poor Quality | Quality · Cost | PAF model. COPQ, total cost of quality, share of revenue, prevention-to-failure ratio. |
| QMS & Documents | |||
| 16 | ISO 9001 Audit Checklist | ISO 9001 · Audit | Clause-specific checklists with evidence-based questions. |
| 17 | A3 Report Generator | Lean · Problem Solving | A3 reports, kaizen charters, standard work, 5-why, one-point lessons. Print to PDF. |
All tools run in your browser. No data is sent to our servers.
Next step
This is one of the bench instruments, standing alone
The calculator above takes numbers you type, one set at a time. On the bench, the same solver runs against a dataset you keep — versioned, with the conditions held beside the result, so the number can still be explained to someone who asks six months from now.